Loma Verde Avenue Trunk Line Improvement Project

  • Project typeStreets and Sidewalks
  • Project value$2,680,913
  • Completion DateDecember 04, 2020
Loma Verde Trunk Link Improvement Project Photo

Project Description

The Loma Verde Avenue Trunk Line Improvement Project was the first of the thirteen proposed Capital Improvement Projects funded by the Storm Water Management Fee ballot measure that was approved by Palo Alto voters in April 2017.

The storm drain pipes on Loma Verde Avenue, between Louis Road and the former Sterling Canal easement just past Maddux Drive, lacked the capacity required to convey runoff from a 10-year storm event. Upsizing these pipes to achieve a 10-year level of service was recommended on the 2015 Storm Drain Master Plan. This will allow the City to upsize the storm drain system upstream of Loma Verde Avenue in the future, thus reducing the flooding risk of an area approximately 77 acres. Approximately 1,700 feet of storm drain line on Loma Verde Avenue was upsized from an existing 36-inch diameter to a proposed 48-inch diameter pipe.

Project Status 

Project was completed December 2020.

Project Location Maps

The maps listed below were designed to help parents and students to identify where the project is located relative to the schools in the area.

Location

Loma Verde Ave, Palo Alto, CA 94306  View Map