Southgate Neighborhood Storm Drain Improvement and Green Street Project

The City of Palo Alto has held two meetings with Southgate residents to solicit input on the preliminary design of the proposed Storm Drain Improvement and Green Street Project within the neighborhood.
 
View the Staff Presentation from the February 1 Community Meeting

Below are materials from the April 3 Community Meeting 
Community Meeting Agenda
Community Meeting Presentation
Option A Conceptual Design Map
Option B Conceptual Design Map
Biorentention Plant Palette




 
The existing storm drain system serving the Southgate neighborhood relies on surface flow along street gutters to a single drain inlet at the corner of Sequoia and Mariposa Avenues.  Uneven gutters cause chronic ponding along neighborhood streets.  The goal of the proposed project is to provide improved drainage performance through the use of innovative and environmentally friendly techniques that reduce storm runoff, eliminate ponding, and enhance neighborhood aesthetics in a way that also encourages bicycle and pedestrian travel. 

PROJECT CONTACTS

Public Works Department - Engineering Division:

Email: pwecips@cityofpaloalto.org
Project Manager: Joe Teresi  (650) 329-2129
Project Engineer: Shari Carlet  (650) 329-2456

Posted February 7, 2012