College Terrace Traffic Calming Project



Project Overview

The College Terrace neighborhood is bounded by El Camino Real on the east, California Avenue on the South, Amherst on the west and Stanford Avenue on the north.

In November 2004, the Palo Alto City Council approved a traffic calming plan for the College Terrace neighborhood. The plan was developed by the Transportation Division in consultation with the residents, based on a study of speeds, volume and cut-through traffic on perimeter and interior streets.

Current Plan

    o Stanford Avenue: Four speed tables, located just west of the intersections with Wellesley Street,
       Oberlin Street, Dartmouth Street and Amherst Street - Approved in 2009
    o California Avenue: Two speed tables, located just west of Wellesley Street and just east of Oberlin
       Street - Approved in 2009
    
o Three pairs (6) small center median islands with stop signs on College at Columbia, Hanover and
       Oberlin
    o Four speed humps to control speeds on College
    o Two traffic circles on Yale at College and Cambridge and the three curb extensions to approaches
    o One speed table on upper California Avenue, between Columbia and Dartmouth

During the trial period, effectiveness of the physical traffic calming measures, level of community acceptance as well as any potential impacts will be monitored. Performance measures related to safety, speed, and volumes will be used to evaluate the trial.

For general questions on this project, please contact the Transportation Division at (650) 329-2520 or Email:  transportation@cityofpaloalto.org

Last Updated: May 3, 2012
College Terrace Traffic Calming Project Evaluation 2010/2011
Before/After Speed and Volume Data
Revision Date: 3/16/2011
Current Plan
Revision Date: 3/16/2011
Neighborhood Letter March 16, 2011
Revision Date: 3/17/2011
PTC - July 2009
Revision Date: 3/16/2011
After Study-Project Trial Evaluation - 2009
Before/After Speed and Volume Data
Revision Date: 5/6/2009
College Terrace Neighborhood Survey Letter
Revision Date: 5/6/2009
Neighborhood Meeting Presentation
Revision Date: 11/20/2008
Project update-August 2008
On August 13, 2008 a letter was sent to all the residents notifying them of the evaluation of the traffic calming measures.
Revision Date: 7/16/2008
Technical Study Memorandum
Revision Date: 5/6/2009
Resources
Approved College Terrace Trial Plan Map
Revision Date: 6/20/2007
Planning and Transportation Commission Staff Report (September 8, 2004)
Trial Implementation of College Terrace Traffic Calming Plan and Attachments A-I
Revision Date: 6/20/2007
Recommended Trial Implementation of the Selected Traffic Calming Plan in the College Terrace Area-(November 22, 2004)
Revision Date: 6/20/2007